PowerFP

PowerFP

February 17, 2013 5:20 pm 0 comments

Power Front Panel

Power front panel. The AC power switch and fuse are in the box on the right. The meter measures current going to the relays. Subsections are individually fused to simplify power fault isolation, with green LED indicators showing that a section is powered. The key switch that controls debug power is under the meter. The Incrementer display is also on this panel.

Leave a reply